Jump to content
LegacyGT.com

mdennett99

I Donated
  • Posts

    49
  • Joined

Posts posted by mdennett99

  1. Yep, that's a big bike! Pretty too. :) I've heard good stuff about the new Suntour forks, but serviceability kinda scares me sometimes. Half the time when I call Suntour for parts on their more expensive stuff, they don't exist. I believe they're focusing on changing that though.

     

    Thanks.

     

    Current build is

    2014 sight frame

    Durolux r2c2 fork set to 160mm

    Cane creek dbair cs

    9point8 fall line 150mm with wolftooth ReMote

    Zee brakes with 203/180 rotors

    E.thirteen trsr carbon crankset

    Absolute black 30t oval

    Xt 11-46 cassette

    Xtr m9000 shifter and derailleur

    Nobl tr38 carbon hoops

    I9 torch hubs

    Maxxis dhf 2.5wt tubeless

    Chromag trailmaster dt

    Chromag ranger v2 40mm stem

    Renthal fatbar carbon 780

     

     

     

    As for their parts, I dont know how it is for a shop with warranty claims. Almost everything is available to purchase on their us site

  2. Boost 110 20mn axle up front? These must be going on a big bike! I absolutely lust over the way i9 hubs sound, it's intoxicating. The maintenance is stupid simple and easy too. I still prefer King hubs though.

     

     

    Sent from my iPhone using Tapatalk

    They are going on my sight. The new Durolux r2c2 is adjustable from 160mm to 180.

     

    Im in the 160 setting.

     

    bb8e3992a865f02943b87bc3406b8ae1.jpg

  3. I can dig all of that, except the fork! SR will forever be blemished in my book after filing dozens of warranty claims on their stuff every year. You need a Fox 36 :)

     

    I have some time on a Pike. And with performance for price, I'll take the Auron all day long. It sucks that you have had issues with SR. They have been nothing but helpful, but slow to respond. If I could get a 36 for a reasonable price I would definitely give it a go.

     

    On another note. I too also ordered my dropper this week after being on the waiting list for 5 weeks. And I'm on the fence about ordering a carbon wheelset.

×
×
  • Create New...

Important Information

Terms of Use